Power Distribution


Power from outside enters the building via the 208V feeder box on the west wall of the work area under the dome. Power to the whole building can be switched off here. It the passes through a lightning protection circuit, then to the main circuit breaker panels.

Electrical distribution box locations

Work area under dome

Laundry south wall


Circuit Breaker Box Functions

Panel P1: observing stuff

Panel P2: kitchen and laundry equipment

  • A/C
  • Stove
  • Heathers, living areas, bedrooms and bathroom
  • Laundry lights and outlets
  • Hot water

    Panel L1:

  • Work area lights
  • Living, lounge and bedrooms lights and power
  • Air compressor
  • Air dryer
  • Microwave and Fridge
  • Koala ups

    Panel U1:

  • Orange outlets in computer room, and dome. (Note these are not clean power)

    UPS locations, power capacity, color, breaker box panel

    Telescope: Work are near relay box2200 VABlackP1
    Computer room: On floor behind rack2200 VABlackP1, via U1
    Dome Console: On shelve above main breaker1400 VACreamP1
    Koala: Under living area west desk1400 VACreamL1
    Electronics lab:1400 VACreamP1

    Output connections from UPS

    Telescope: 3 cords; Relay Box, 4x4 Box, and long cord upto CCD
    Dome Console: Extension cord up to Dome console
    Computer room: computers, equipment, and terminal strips
    Koala: Koala & monitors, extension cord to east desk.
    Electronics lab:


    What the UPSs power

    Telescope: (2200VA)

    Dome Console (1400VA)

    Computer room

    Living Room

    Electronics Lab


    Power that needs to be on for observing

    Telescope Motion CCD Filter and Shutter Diagnostics Table of Contents    

    Last Updated: 18/4/04